CASE STUDY

Solving anchoring problems on viaducts and bridges

This editorial demonstrates one of the many ways in which we have helped our customers by providing safe and secure temporary barrier systems.

The contractors for the bridge works, Jackson Civil Engineering, required temporary barriers to provide safe work zones as repair work was planned around the clock, and to keep lanes of traffic open on the ring road.

The solution was APC Civils temporary barriers as this design could self-stand without the need of being bolted down to the road surface. Anchoring would have would have damaged the bridge waterproofing membrane.

RELATED CASE STUDIES

HS2 Workforce Protection

Installing a barrier system to provide suitable protection around a busy concrete batching plant area at Washwood Heath, as part of ongoing work on HS2.

FIND OUT MORE >

Rapid response required for waterways bridge strike

About the project A day before the holiday shut down, we received a call from A1 Traffic Safety Services to…

FIND OUT MORE >

Solving workforce protection on curved roads around Telford town centre

About the project When a programme to improve Telford town centre’s road links began in October 2016, two roads in…

FIND OUT MORE >

UK

APC Civils Limited,
C/O Buffaload logistics,
East Gillibrands Industrial Estate,
Gillibrands Road, Skelmersdale,
WN8 9TA

IRELAND

APC Barriers Limited,
Villa Maria, Drogheda Road,
Ardee, County Louth,
A92 X680,
Ireland